The electric power of the turbine generator is being increased. At present, it is 125 MW.
«Hotline» of SE «Belarusian NPP»
On November 19 at 14.04, the first power unit of Belarusian nuclear power plant was connected to the power network.
The electric power of the turbine generator is being increased. At present, it is 125 MW.