Republican Unitary Enterprise

Belarusian nuclear
power plant

Address:

NPP construction site, 231201, Ostrovets, Grodno region. 

Е-mail: belaes@belaes.by

Phones:

Reception: +375 (1591) 4-53-59, fax: +375 (1591) 4-54-00

HR department: +375 (1591) 45-357; +375 (1591) 46-696

Accounts department: +375 (1591) 46-358

Monday, 15 March 2021

Loading of the fuel assemblies simulators into the reactor vessel of Belarusian NPP second power unit has been completed

Written by Отдел информации и общественных связей

Total number of the loading simulators is 163.

Fuel assembly simulators are an exact copy of fuel assemblies, completely repeating their design. They are used instead of standard fuel assemblies during the commissioning period to check the reactor system for compliance with design characteristics and safety requirements.

The assembly and erection works of the second power unit reactor for the further preparation to hydraulic test and to circulation cleaning of primary circuit system have been continued.

 

Last modified on Monday, 15 March 2021
© 2010- State enterprise «Belarusian NPP». All rights reserved. At any use of materials of the web-site, the active reference is obligatory on www.belaes.by.
The web-site operates error-checking system. If you find a mistake, highlight it and press Ctrl + Enter.
Яндекс.Метрика
Development of CVR-Oktjabr'skij
Send a mistake message